Ayodhya 4-Lane Railway Over Bridge (ROB)

Design and Construction of Bow String Girder Over Bridges (Main Railway Portion Only), including a 4-Lane Bow String Girder ROB at Railway Level Crossing No. 107A/2T on the Varanasi–Lucknow Rail Section near Darshan Nagar, and a 2-Lane ROB at Railway Crossing No. 112 on Panchkosi Parikrama Marg in Ayodhya District, Uttar Pradesh, including foundation and substructure works of the railway portion (EPC Basis).

State : Uttar Pradesh
Length :
Date of Start : 11-05-2023
Project Cost : ₹33,26,67,932.00
Commissioned Under : State Bridge Corporation Limited, U.P.