Loading...

Completed Project

Ayodhya 4-Lane Railway Over Bridge (ROB)

Design and Construction of 2 Bow String Steel Girder Main Railway Bridge Portions, including a 4-Lane ROB at L-Xing No. 111-B forming part of NH-27 Bypass via Mahoba Bazar to Shree Ram Janm Bhumi, and a 2-Lane ROB at L-Xing No. 105 on Chaudah Koshi Parikrama Marg in Ayodhya District, Uttar Pradesh, including foundation and substructure works of the RLY portion (EPC Basis).

State : Uttar Pradesh
Length :
Date of Start : 17-05-2023
Project Cost : ₹76,83,17,698.00
Commissioned Under : State Bridge Corporation Limited, U.P.